AI Buildout PermitsAdd to Claude

Texas · Carson County

Project Matador (Fermi America HyperGrid campus, Amarillo)

Air permit filed

Permittee
Fermi America, Fermi Nuclear
→ FRMI Fermi Inc.

Who's named

As each record spells it, and who that resolves to.

  • Permittee, Power plant owner
    Fermi America
    EIA entity 67738
    → FRMI Fermi Inc.alias match, high confidence
  • Power plant owner
    Fermi Nuclear
    EIA entity 67737
    → unresolved
  • Equipment maker
    GE Vernova
    6B
    → GEV GE Vernova Inc.alias match, high confidence
  • Equipment maker
    Siemens Energy
    SGT-800
    → ENR.DE Siemens Energy AGalias match, high confidence

Power

  • 3 × GE Vernova 6B · 135 MW
    Three (3) natural gas fired CTGs to operate in simple cycle mode (EPNs GE6BSC-1, GE6BSC-2, GE6BSC-3) or combined cycle mode (EPNs GE6BCC-1, GE6BCC-2, GE6BCC-3). All turbines are GE Frame 6001 (GE 6B) each with an annual average heat input of 478 million British thermal units per hour (MMBtu/hr) and each with a rated gross nominal capacity of 45 megawatts (MW).
  • 90 × Siemens Energy SGT-800 · 5040 MW
    Ninety (90) natural gas fired combustion turbine-generators (CTGs) to operate in combined cycle mode (EPNs HRSGA-1 through HRSGH-12). All turbines are Siemens Energy SGT-800, each with an annual average heat input of 443 million British thermal units per hour (MMBtu/hr) and each with a rated gross nominal capacity of 56 megawatts (MW).
  • 39 × Natural Gas Fired Combined Cycle · 4095 MW · planned 2027-12 to 2030-12
    EIA-860M September 2026, plant 69799 'Project Matador Gas Plant (PMG)': 39 x Natural Gas Fired Combined Cycle (CA), 4095.0 MW nameplate, status planned
  • 108 × Natural Gas Fired Combined Cycle · 7332 MW · planned 2027-12 to 2030-12
    EIA-860M September 2026, plant 69799 'Project Matador Gas Plant (PMG)': 108 x Natural Gas Fired Combined Cycle (CT), 7332.0 MW nameplate, status planned
  • 10 × Natural Gas Fired Combustion Turbine · 252.3 MW · planned 2027-06 to 2027-09
    EIA-860M September 2026, plant 69799 'Project Matador Gas Plant (PMG)': 10 x Natural Gas Fired Combustion Turbine (GT), 252.3 MW nameplate, status planned
  • 4 × Nuclear · 4468 MW · planned 2031-12 to 2032-12
    EIA-860M September 2026, plant 69798 'Project Matador Nuclear': 4 x Nuclear (ST), 4468.0 MW nameplate, status planned

Timeline

  • Date not in record
    Air permit filed
    TCEQ air permit backup (agenda docket 2025-1898): 3 x GE Vernova 6B; 90 x Siemens Energy SGT-800; 15 x Siemens Energy SGT800
    Record
  • Date not in record
    Generator planned
    EIA-860M September 2026 lists 39 planned Natural Gas Fired Combined Cycle units, 4095.0 MW, planned online 2027-12 to 2030-12
    Record
  • Date not in record
    Generator planned
    EIA-860M September 2026 lists 108 planned Natural Gas Fired Combined Cycle units, 7332.0 MW, planned online 2027-12 to 2030-12
    Record
  • Date not in record
    Generator planned
    EIA-860M September 2026 lists 10 planned Natural Gas Fired Combustion Turbine units, 252.3 MW, planned online 2027-06 to 2027-09
    Record
  • Date not in record
    Generator planned
    EIA-860M September 2026 lists 4 planned Nuclear units, 4468.0 MW, planned online 2031-12 to 2032-12
    Record

Sources

Campus link: record