Texas · Carson County
Project Matador (Fermi America HyperGrid campus, Amarillo)
Air permit filed
Permittee
Fermi America, Fermi Nuclear
→ FRMI Fermi Inc.
Who's named
As each record spells it, and who that resolves to.
- Permittee, Power plant ownerFermi AmericaEIA entity 67738
- Power plant ownerFermi NuclearEIA entity 67737→ unresolved
- Equipment makerGE Vernova6B
- Equipment makerSiemens EnergySGT-800
Power
- 3 × GE Vernova 6B · 135 MWThree (3) natural gas fired CTGs to operate in simple cycle mode (EPNs GE6BSC-1, GE6BSC-2, GE6BSC-3) or combined cycle mode (EPNs GE6BCC-1, GE6BCC-2, GE6BCC-3). All turbines are GE Frame 6001 (GE 6B) each with an annual average heat input of 478 million British thermal units per hour (MMBtu/hr) and each with a rated gross nominal capacity of 45 megawatts (MW).
- 90 × Siemens Energy SGT-800 · 5040 MWNinety (90) natural gas fired combustion turbine-generators (CTGs) to operate in combined cycle mode (EPNs HRSGA-1 through HRSGH-12). All turbines are Siemens Energy SGT-800, each with an annual average heat input of 443 million British thermal units per hour (MMBtu/hr) and each with a rated gross nominal capacity of 56 megawatts (MW).
- 39 × Natural Gas Fired Combined Cycle · 4095 MW · planned 2027-12 to 2030-12EIA-860M September 2026, plant 69799 'Project Matador Gas Plant (PMG)': 39 x Natural Gas Fired Combined Cycle (CA), 4095.0 MW nameplate, status planned
- 108 × Natural Gas Fired Combined Cycle · 7332 MW · planned 2027-12 to 2030-12EIA-860M September 2026, plant 69799 'Project Matador Gas Plant (PMG)': 108 x Natural Gas Fired Combined Cycle (CT), 7332.0 MW nameplate, status planned
- 10 × Natural Gas Fired Combustion Turbine · 252.3 MW · planned 2027-06 to 2027-09EIA-860M September 2026, plant 69799 'Project Matador Gas Plant (PMG)': 10 x Natural Gas Fired Combustion Turbine (GT), 252.3 MW nameplate, status planned
- 4 × Nuclear · 4468 MW · planned 2031-12 to 2032-12EIA-860M September 2026, plant 69798 'Project Matador Nuclear': 4 x Nuclear (ST), 4468.0 MW nameplate, status planned
Timeline
- Date not in recordAir permit filedTCEQ air permit backup (agenda docket 2025-1898): 3 x GE Vernova 6B; 90 x Siemens Energy SGT-800; 15 x Siemens Energy SGT800Record
- Date not in recordGenerator plannedEIA-860M September 2026 lists 39 planned Natural Gas Fired Combined Cycle units, 4095.0 MW, planned online 2027-12 to 2030-12Record
- Date not in recordGenerator plannedEIA-860M September 2026 lists 108 planned Natural Gas Fired Combined Cycle units, 7332.0 MW, planned online 2027-12 to 2030-12Record
- Date not in recordGenerator plannedEIA-860M September 2026 lists 10 planned Natural Gas Fired Combustion Turbine units, 252.3 MW, planned online 2027-06 to 2027-09Record
- Date not in recordGenerator plannedEIA-860M September 2026 lists 4 planned Nuclear units, 4468.0 MW, planned online 2031-12 to 2032-12Record
Sources
- Texas Commission on Environmental Quality retrieved 2026-11-20 · sha256 a718417e5d5c…
Texas Commission on Environmental Quality, docket 2025-1898 backup - U.S. Energy Information Administration retrieved 2026-11-20 · sha256 bcef74e1af99…
U.S. Energy Information Administration, Form EIA-860M (September 2026)
Campus link: record